THIS
GIANT 32' FOOT TALL 5 TON, TIN SOLDIER
WAS FABRICATED AT 
AUSTIN METAL FABRICATORS IN BURNABY BC.
ON NOVEMBER 29 2000 AT 5:00 pm, THE UNVEILING TOOK PLACE
AT THE ROYAL WESTMINSTER REGIMENT ARMOURY
IN NEW WESTMINSTER BC CANADA .
ALL PART OF A NINE-DAY FESTIVAL OF TREES FUNDRAISING EVENT
FOR THE SIMON FRASER SOCIETY FOR COMMUNITY LIVING .
The Tin Soldier has been moved to its permanent home at the New Westminster Quay down on the waterfront. Dedication ceremonies were held February 14 Valentines Day 2001 at 3:00 pm including the placement of a Time Capsule that will be opened in the year 2025.
Click Links Below To View The TIN SOLDIER FABRICATION STEP BY STEP!
Part 1 Structural Frame Fabrication
Part 2 Starting the Skin & Feet
Part 3 Head, Hands, Feet Starting To Come Together!
Part 5 Ready For Shipping To The Painters
Part 7 Erecting For The First Time At The Armoury
Part 9 The Big Move, A New Look!
THIS PROJECT WAS MADE POSSIBLE BY THE FOLLOWING CONTRIBUTORS
BC SHEET METAL ASSOCIATION (SMACNA-BC)
SHEET METAL WORKERS LOCAL UNION 280
CONCEPT AND COORDINATION BY WAYNE WRIGHT
DESIGN BY DANNY JAY AND AUSTIN METAL FABRICATORS
FABRICATION BY AUSTIN METAL FABRICATORS
SHEET METAL WORKERS TRAINING CENTER
INTERNATIONAL UNION OF PAINTERS AND ALLIED TRADES
PAINTING BY SEASIDE PAINTERS & SANDBLASTING LTD
ENGINEERING PROVIDED BY RKTG ASSOCIATES LTD
CEMENT MASONS & PLASTERERS LOCAL UNION 919
OPERATING ENGINEERS LOCAL UNION 115
PAINT SUPPLIED FROM DEVOE COATINGS
ON SITE WELDING PROVIDED BY TRI-METAL FABRICATORS
TIME CAPSULE SUPPLIED BY QUEST METAL WORKS
FRASER RIVER PILE AND DREDGE LTD
GUSTALDO CONCRETE LTD
ROLSTON CRANE LTD
Management & Labor Working Together